pay off
Home> Products >pay off

vertical tension control dancer

Item No.: TR120-150
vertical tension control dancer, the balance rod position to control the tension. used together with the pay off or take up, control the pay off or take up tension, linked the pay off or take up speed with the main machine.
INQUIRY
Description package&transporation test running & installation and commission
vertical tension control dancer
usage: 
vertical tension control dancer, the balance rod position to control the tension. used together with the pay off or take up, control the pay off or take up tension, linked the pay off or take up speed with the main machine.


machine features:
1. tension control dancer adopt counter weight structure, guiding pulley rotate nimbly, small interference on tension
2. pay off tension can adjust without limit, move weight block is easy to operate.


technical parameter:
tension dancer models:  120, 180, 250, 300, 400, 500
structure: vertical spring counter weight tension rack
guiding pulleys: Φ120,180, 250, 300, 400, 500;  American standard 6061 durable aluminum, precise machining, grooves hardening and resistant treatment, round bottom in grooves, standard is fixed 5 grooves, running 4 grooves.
wire dia.: Φ0.2-60mm
center height: standard is 1000, or customized.
tension control: through moving the weight block to change the pay off tension
tension range: 0-20000g
save guard: with bottom and up limit anti-collision rod, wire break machine auto stop.
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF


pictures for reference:


machine package
test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X