pay off
Home> Products >pay off

flyer pay off

Item No.: FD400-800
flyer pay off generally used together with high speed extrusion line, for copper wire or core wire high speed continuous pay off
INQUIRY
Description package&transporation test running & installation and commission
flyer pay off
usage: 
flyer pay off generally used together with high speed extrusion line, for copper wire or core wire high speed continuous pay off

machine features:
1. continuous pay off: copper wire or core wire fixed on the pay off trolley in the pay off barrel,pay off in sequence, when pay off at high speed,electrical wire pay off ring will makes the wire flying out, used for high speed extrusion line, to reduce the joint and stop time, increase productivity.
2. stable pay off tension: magnetic double wheel tension device, make the wire having tension, adjust pay off tension through seting the magnetic clutch voltage, the pay off tension keep stable.
3. safe guard: with motor overload/phase lack/lift limit/and other protection, reduce the machine failure and enlonger the service lift.

technical parameter:
models:  400, 500, 630, 800
structure: flyer continuous pay off
reel dia.: Φ250-Ø800
wire dia.: Ø0.3-10.0mm
line speed: Max.800m/min
reel lift: worm gear speed reducer lift reels
reel tighten: shaft cover screw tighten
brake:/
wire break: wire break machine auto alarm and stop
driven power: from 0.4KW-1.5KW based on request.
bearing weight: Max.300-800kg
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF

pictures for reference:


take up package
test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X