take up
Home> Products >take up

take up --- electrical lift

Item No.: ET630-800
electrical lift take up used for small size copper wire, aluminum wire, core wire, cable and other wire material take up
INQUIRY
Description package&transporation test running & installation and commission
take up --- electrical lift
usage: 
electrical lift take up used for small size copper wire, aluminum wire, core wire, cable and other wire material take up


machine features:
1. easy to operate: take up tighten reel from two side, with sliding rail in the middle, easy to position, electrical lift, hand wheel tighten, can quickly load and unload reels.
2. neat traverse: adjustable take up traverse pitch and range, traverse speed linked with take up speed.
3. safety guard: take up has motor overload/phase lack/lift limit and other protection, makes the machine safe to operate and wear-resistant.


technical parameter:
take up models:  630, 800
take up structure: electrical lift, mechanical traverse, shaftless take up.
Reel dia.:Φ400-Ø800
wire dia.: Φ0.5-10.0mm
reel lift: electrical
reel tighten: standard is hand wheel, pneumatic as optional
brake: /
line speed: Max.300m/min
traverse: Φ40 polish rod traverse
traverse pitch: adjust traverse speed meter to adjust traverse pitch
traverse range: adjust traverse limit position to adjust traverse pitch
traverse power: mechanical drive, linked with take up
length counter: with length meter, and forecast function, set length reach machine auto stop.
drive power: min.0.75KW, Max.5.5KW
bearing weight: Max.800-1200kg
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF


pictures for reference:


test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X