pay off
Home> Products >pay off

pay off --- manually lift

Item No.: SD300-630
pay off used for small size core wire, cable and other wires pay off, generally cooperate with single twisting machine and laying up machines. the pay off is driven pay off, manually lift.
INQUIRY
Description package&transporation test running & installation and commission
pay off --- manually lift
usage: 
pay off used for small size core wire, cable and other wires pay off, generally cooperate with single twisting machine and laying up machines. the pay off is driven pay off, manually lift.


machine features:
1. save space: pay off use integrate design, pay off and tension dancer integrate design, save space and also the labour cost.
2. stable tension control: pay off use counter weight tension control, driven pay off.
3. safety protection: pay off with motor overload/lack phase/lift limit/ and other protection, ensure the longer service lift of the machine.


technical parameter:
pay off models: 300, 400, 500, 630
pay off structure: shaft type driven pay off.
pay off Reel size: Ф100-Ф630, 
pay off products range: 0.2 to 5.0mm
pay off line speed: 12 to 150m/min, based on the request.
pay off Reel lift: manually
pay off reel tighten: tip cone tighten
pay off tension control: counter weight tension control, adjust pay off tension through moving weight block, pretiometer angel given voltage signal to control the pay off motor, tension range 0-1500g.
pay off wire break test: wire break machine auto stop.
pay off guiding pulley: 3 grooves + 2 grooves.
pay off driving motor: 0.2 to 1.5KW based on request.
pay off bearing weight: 300-500kg
Royal Machinery can arrange different kinds of package for customer's different request.
1. welding fix & anti-collision film cover for truck shipment
2. fix on wooden pallet & anti-collision film cover for whole container shipment
3. wooden bar fixed & anti-collision film cover for whole container shipment and partial shipment
4. wooden case fixed  & anti-collision film cover for whole container shipment and partial shipment

for the transaction terms, we can do: EXW, FOB, C&F, CIF


pictures for reference:


test running in seller's factory:
1. To ensure our products quality, generally we will inform our customer to test running the machine in our factory about 7 days before delivery.
2. if customer need the samples for testing, then need to prepare the qualified raw material before test running.
3. if customer do not have time to come for test running, we will test running the machine ourselves to check the quality, and send the test running video to customer.

installation and commission in buyer's factory:
1. about 3 days after the machine delivery, our engineer will given the installation design to customer for confirmation.
2. if customer want to install and commission the machine themselves, we will send the installation design, electrical circuit drawings, machine operation manuals, and provide any other information according to customer's request.
3. if customer need our engineer to install and commission the machine for them, we can provide engineer to the customer's factory. our engineer will strictly comply with the agreed installation drawing to install and commission the machine for customer, train the workers how the operate the machine properly, and tell customer how to maintain and repair generally problems .


 
Review


1/3
X